How to Lay a Paver Walkway

A paver walkway looks professional and lasts for years when the base is done right. This guide covers materials, depths and each step.

  • Step by step
  • Material list included
  • Free calculator inside

Material list for a 3 × 20 ft walkway

MaterialAmount
4 × 8 in pavers270 + 10% = 297 pavers
Compacted base gravel, 4 in20 cu ft = 0.74 yd³ (≈ 1.0 ton)
Bedding sand, 1 in5 cu ft = 0.19 yd³ (≈ 0.25 ton)
Edge restraintAbout 46 linear ft (both sides + ends)
Joint sand / polymeric sandSee bag coverage chart

Use the paver calculator to change the size or paver type.

Step 1: Lay out the path

Mark both edges with string lines. A width of about 3–4 ft lets one person walk comfortably; wider paths suit two people side by side. Call 811 before you dig.

Step 2: Excavate

Dig to the depth of the base + sand + paver thickness. For 4 in base, 1 in sand and 2⅜ in pavers that is about 7½ inches. Give the path a slight cross-slope so water runs off.

Step 3: Build the base

Compact the soil, then add base gravel in 2-inch layers, compacting each one. The base does the real work – most paver problems come from a thin or poorly compacted base.

Step 4: Screed the sand

Lay two pipes on the base as guides, spread about 1 inch of sand and pull a straight board across the pipes. Do not walk on the screeded sand.

Step 5: Lay the pavers

Start at a straight edge and place pavers straight down – do not slide them. Cut edge pieces with a masonry saw or splitter.

Step 6: Edge, compact and fill joints

Install edge restraints, run a plate compactor (with a protective pad) over the pavers, then sweep joint sand into the gaps. If you use polymeric sand, follow the product instructions exactly for wetting.

How to lay a paver walkway – materials, base depth and steps

Pattern choices and their waste rates

The pattern you choose changes both the look of the walkway and the number of pavers you should order. Running bond, where each row is offset by half a paver, needs the fewest cuts on a straight path, and the 10% allowance in the material list above covers it comfortably. Basket weave, pairs of pavers laid at right angles to each other, gives a classic garden-path look, but every edge of the pattern meets the border at a cut, so allow more spare pavers than the 297 figure. Herringbone, with pavers set at angles to each other, gives the strongest interlock and is the best choice where the path turns or carries a wheelbarrow, but almost every edge piece is a cut, so it is the hungriest pattern for waste: order above the 10% allowance and keep every offcut, because a half-paver cut for one side often fits a gap on the other side. Stack bond, a plain grid with the joints lined up, is the simplest to lay and uses the fewest cuts of all, yet it can look flat and the joints can wander if the base is not perfectly flat. Before you commit to a pattern, sketch one repeat of it on paper at the walkway's width, because a width that does not divide evenly by the paver size forces a cut row along one side for the whole length. For a different size or paver type, run the numbers through the paver calculator first, then add the pattern allowance on top.

Cutting pavers safely

Most walkways need some cuts, and they go far better with a plan. Mark each cut with a pencil or chalk line on the paver's face, and measure twice: a paver cut a fraction short leaves a gap that joint sand cannot hide, while one cut long can be trimmed again. For straight cuts on thinner pavers, a score-and-break splitter does the job quietly and without dust. For curves, thick pavers and most edge pieces, a wet saw or an angle grinder fitted with a diamond blade is the right tool; wet cutting keeps the dust down and the blade cool. Whatever you cut with, wear safety glasses, hearing protection, gloves and a dust mask, and keep your hands well clear of the blade's path. Cut outdoors where possible, and never cut dry indoors: concrete dust hangs in the air and settles everywhere. Let the blade do the work rather than forcing the paver through it, and save your offcuts in a bucket as you go. A cut piece from one edge often fits a gap on the other side, and a chipped or damaged cut can still serve at the back of the path or tucked under a border, where nobody looks closely.

Joint sand and sealing

Joints are finished after the pavers are compacted, and the choice of sand matters. Sweep ordinary joint sand into the joints, compact again, then sweep again until the joints stay full: the second pass matters, because the first compaction always drops the sand level. Ordinary sand is cheap and easy to top up, but it washes out in heavy rain and weeds seed in it readily. Polymeric sand sets hard when it is watered in, so it resists washout and weeds, but it only works if the joints are completely dry when it goes in and no rain falls before it sets, so check the forecast and follow the bag's instructions. Never sweep polymeric sand over wet pavers, or it stains the surface. Sealing is optional: it deepens the colour, makes cleaning easier and helps joints stay put, but it also darkens the pavers and needs redoing every few years, so test it on one spare paver and let it dry before sealing the whole walk. Never seal before the joints are full and the surface is fully dry, or the sealer traps moisture underneath and turns cloudy.

Fixing settling spots

A dip in a paver walkway usually means the base, not the paver, so fix the layer underneath rather than just pushing the paver down. Lift the affected pavers and number them with chalk so they go back in the same order. If the bedding sand has washed into a hollow, top it up and screed it level with a straight board, then relay the pavers and compact them again. If the base gravel itself has sunk, the base was not compacted in layers or water is undermining it: add base gravel, compact it in 2-inch layers as in Step 3, then re-screed the sand and relay. Check the edge restraint first, before relaying anything: if it has bowed outward, the pavers drift and the joints open up again, so re-fix or replace the restraint first. Water pooling on the path points to a low spot in the base, so re-grade that stretch so water runs off the side rather than sitting on the surface. A single rocking paver usually just needs its bedding sand levelled. If all this cutting and relaying sounds like more work than you want, a loose-fill surface needs no cuts at all: the gravel patio guide shows a build that forgives an uneven base far more readily than pavers do.

Frequently Asked Questions

How deep should the base be for a paver walkway?

Around 4 inches of compacted base gravel plus about 1 inch of bedding sand is common for walkways.

How many pavers do I need for a 3x20 walkway?

60 sq ft with 4 × 8 in pavers needs 270 pavers, or about 297 with 10% extra.

Can I lay pavers directly on dirt?

It is not recommended. Without a compacted base, pavers shift and sink.

Order the right amount the first time

Measure your area, pick a depth and get cubic yards, tons, bags and cost – free, no sign-up, works on your phone.

Open gravel calculator